Ornamental Bridge
Fullerton, California
April, 2005 -- An ornamental Redwood bridge designed, built,
and installed over a false river bed.
|
|
|
|
|
|
|
|
|
Early fitup of the machined components. The treads are layed out to determine the placement and size to provide uniform spacing. |
|
|
|
|
|
|
|
|
This assembly will be used to mark the location for many of the edge treatments that will be added to the handrail, the lower rail, the treads, and the support girders. |
|
|
|
|
|
For More Information Contact:
Tom's Woodworking
9 Wildwood Circle Silver City, NM 88061
Tel: 619-316-5374
FAX: 858-578-5276
Email:
|